Minworth Thermal Hydrolysis Plant
The £37m Thermal Hydrolysis Plant (THP) at Minworth was a critical asset project.
Our supply chain performance team visited CAMBI’s factory throughout the manufacture and testing periods to ensure work was proceeding in accordance with the programme and appropriate standards were being maintained. This together with detailed collaborative planning and digital rehearsals with CAMBI, resulted in the plant being delivered 4 weeks early.
Working collaboratively with Dunphy Combustion we produced an off-site constructed optimised boiler house. Using BIM and digital install rehearsals we optimised the delivery plan. The Boiler House was constructed in 4 days saving 5 weeks on an optimised programme and 30 weeks against traditional methods.
“Minworth has been a beacon for collaboration between supply chain and main contractor on complex technical processes, it has helped shape the way we deliver these schemes with others, particularly the use of 3D and 4D modelling, helping us all visualise the plan and manage the interfaces”
Paul Whalley, Cambi UK